Device for conveying fuels into a gasification reactor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10696912
APP PUB NO 20190016979A1
SERIAL NO

16135313

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of conveying fuel, such as bulk material, into a gasification reactor that has a lateral infeed opening can be practiced with device for conveying fuels into a gasification reactor comprising a bulk material container, a conveying pipe, into which a discharge of the bulk material container opens and which can be connected to a lateral infeed opening of the gasification reactor, and a mechanical conveying apparatus disposed in the conveying pipe, the conveying apparatus is formed by a hydraulically drivable plunger, which is movably guided in a first, cylindrical section of the conveying pipe, and in that the conveying pipe has an internal cross-section which decreases continuously in the conveying direction of the fuel in order to form a compacting cone in a second axial section that is downstream of the first section, wherein the second section is configured as an exchangeable pipe portion with another exchangeable pipe portion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CARE BETEILIGUNGSVERWALTUNG GMBH1040 WIEN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Rensing, Michael Hamburg, DE 2 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 30, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 30, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00