Dual stage cyclone separator, dual stage cyclone separator assembly, and method of using same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10695775
SERIAL NO

16696940

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A compact dual stage cyclone separation assembly, an efficient dual stage cyclone separator, and a method for utilizing the same, comprising a lower pressure drop across the dual stage separators due to fewer particle-contaminated gas flow directional changes in the particle contaminated gas stream, and method for using same. The dual stage cyclone separator comprises a primary stage cyclone barrel and a second stage cyclone barrel, wherein the second stage cyclone barrel is coaxial with and concentric within the first cyclone separator, a solids extraction port, wherein said sidewall of said main body defines a solids extraction port opening located between said upper end and said lower end for discharging large particles from said cyclone body, and a small particle discharge opening, wherein the small particle discharge opening is located inside the lower end of the main body.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HEDRICK BRIAN WOREGON IL

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hedrick, Brian W Oregon, US 54 721

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 30, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 30, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00