Marker, immunoassay method, immunoassay reagent, method for assaying analyte, analyte measurement kit, and lateral-flow chromatographic test strip

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10690665
APP PUB NO 20170168049A1
SERIAL NO

15323102

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A resin-metal composite 100 to be used as a marker in an immunoassay, said resin-metal composite 100 comprising a resin particle 10 and metal particles 20 and having the following constitution (A) or constitution (B): (A) the average particle size of the resin-metal composite exceeding 300 nm; or (B) the average particle size of the metal particles being in the range of more than 20 nm and less than 70 nm. It is preferred that a part of the metal particles 20 are two- or three-dimensionally distributed in the surface layer part 60 of the resin particle 10, a part of the three-dimensionally distributed metal particles 20 are partly exposed to the outside of the resin particle 10, and a part of the remainder particles are enclosed in the resin particle 10.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIPPON STEEL CHEMICAL & MATERIAL CO LTD13-1 NIHONBASHI 1-CHOME CHUO-KU TOKYO 1030027 ?1030027

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Enomoto, Yasushi Tokyo, JP 12 74
Matsumura, Yasufumi Tokyo, JP 14 87
Shinta, Ryuzo Tokyo, JP 11 69

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 23, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 23, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00