Pole vault pit construction

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10688331
SERIAL NO

16009399

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A pole vault pit construction that is formed of multiple resilient foam blocks that are secured in a unitary manner and wherein thee construction is comprised of a front cutout section defining a recess for receiving a pole engager, said front cutout section having an open front end and an inner end, and a contiguous rear landing section. The plurality of foam blocks of the front cutout section include at least one pair of opposed position blocks each having a tapered surface commencing from the upper surface downwardly to the lower surface and in a direction toward the opposed position block so that a cross-section of the recess is essentially trapezoidal. The rear landing section includes at least a center foam block having an uninterrupted tapered surface commencing from the upper surface downwardly to the lower surface and in a direction toward the open front end of the recess.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MFAC LLC1600 DIVISION ROAD WEST WARWICK RI 02893

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hull, Gregory Phoenix, US 1 2
Strawderman, Mark Cranston, US 1 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 23, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 23, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00