Evaporation type burner

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10684008
APP PUB NO 20180094806A1
SERIAL NO

15561307

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A promotion member is disposed a predetermined distance apart from an impregnation member disposed at an upstream side end of a combustion chamber, and an ignition device and a first air supply opening are prepared on an upstream side from the promotion member in an ignition space, and a second air supply opening is prepared on a downstream side from the promotion member in the ignition space. Fuel is supplied to a smooth surface of the impregnation member, and a concave part or cutout is formed in the impregnation member to house at least a part of the ignition device. A flow rate of air supplied to the combustion space through the second air supply opening becomes larger toward the downstream side. Thereby, ignitability in an evaporation type burner is improved and incomplete combustion of fuel on the downstream side of the combustion chamber is reduced.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SANGO CO LTD3-1 MUTSUNO 1-CHOME ATSUTA-KU NAGOYA-SHI AICHI 4560023 ?4560023

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kido, Daisaku Miyoshi, JP 1 5
Tsuchiya, Yoshihiro Miyoshi, JP 178 2504

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 16, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 16, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00