Fluid couplings and methods for additive manufacturing thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10683952
APP PUB NO 20180087696A1
SERIAL NO

15825947

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method is provided involving an additive manufacturing system. This method includes a step of forming a first fluid conduit using the additive manufacturing system. The method also includes a step of providing a fluid coupling. The fluid coupling includes the first fluid conduit and a second fluid conduit. The first fluid conduit is connected to and fluidly coupled with the second fluid conduit. The first fluid conduit has a first configuration. The second fluid conduit has a second configuration that is different than the first configuration.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RTX CORPORATION10 FARM SPRINGS ROAD FARMINGTON CT 06032

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Coffey, Roger O Glastonbury, US 18 171
Funk, Stanley J Southington, US 25 329
Kironn, Lexia Rocky Hill, US 35 384
Moura, Dennis M South Windsor, US 55 318
Ott, Joe Enfield, US 49 721
Rup,, Jr John J Willington, US 16 107
Schirtzinger, Gary A Glastonbury, US 29 492
Stempinski, Shawn Simsbury, US 22 265

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 16, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 16, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00