Process of making a multi-ply fibrous water soluble product

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10683618
APP PUB NO 20190234023A1
SERIAL NO

15881156

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for manufacturing a water soluble product including the steps of: providing a water soluble fibrous parent continuous ply web, the parent continuous ply web extending in the cross direction between an operator edge and drive edge; cutting the parent continuous ply web in the machine direction to provide a first continuous ply web that includes the drive edge and a second continuous ply web that includes the operator edge; superposing the first continuous ply web and the second continuous ply web to form a web stack so that the operator edge and the drive edge are on opposite sides of a centerline of the web stack in the machine direction; and cutting and joining portions of the web stack to form the water soluble product.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THE PROCTER & GAMBLE COMPANYONE P&G PLAZA CINCINNATI OH 45202

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Glassmeyer, Stephen Robert Cincinnati, US 46 505
Nyangiro, Dinah Achola Mason, US 21 154
Pratt, Michael Sean St. Bernard, US 37 611
Reed, Anthony Edward West Chester, US 9 39
Sivik, Mark Robert Mason, US 399 5766

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 16, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 16, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00