A power distribution system, modular data center (MDC), and method provide a permanent electrical enclosure sized for an eventual maximum load allowing for flexible ampacity and concurrent upgradeability. A busway is mountable in a MDC to carry three-phase AC electrical power. A three-phase electrical cable is rated to carry a maximum power value to connect to a power distribution unit (PDU) of a first rack-based information handling system (IHS) of the MDC. A bus plug is engaged to the first busway and has at least three conduction paths that electrically connect to the three-phase electrical cable. Interchangeable fused switch modules of different power ratings are selectable to be received in a fused switch module receptacle in the bus plug. A reduced power fused switch module for initial power capacity of the MDC can later be upgraded to a maximum power rating without changing anything but the fused switch module.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DELL PRODUCTS L PONE DELL WAY ROUND ROCK TX 78682

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bailey, Mark M Round Rock, US 51 343
Middleton, Anthony P Cedar Park, US 12 83

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 9, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 9, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00