Hard coating and hard coating-covered member

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10675690
APP PUB NO 20180243837A1
SERIAL NO

15756730

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hard coating, which is to be disposed to cover a surface of a substrate, has a total thickness of 0.5-20 μm, and includes an A layer and nanolayer-alternated layer that are alternately laminated by physical vapor deposition. The nanolayer-alternated layer includes a B layer and a C layer that are alternately laminated. The A layer has a thickness of 50-1000 nm and is AlCr nitride that is represented by a composition formula of [Al1-UCrU]N wherein an atomic ratio U is 0.20-0.80. The B layer has a thickness of 1-100 nm and is TiAl nitride that is represented by a composition formula of [Ti1-WAlW]N wherein an atomic ratio W is 0.30-0.85. The C layer has a thickness of 1-100 nm and is TiSi nitride that is represented by a composition formula of [Ti1-YSiY]N wherein an atomic ratio Y is 0.05-0.45. The nanolayer-alternated layer has a thickness of 50-1000 nm.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
OSG CORPORATIONTOYOKAWA-CITY AICHI 442-0005

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sakurai, Masatoshi Toyokawa, JP 186 1735
Sugita, Hiroaki Toyokawa, JP 49 299
Wang, Mei Toyokawa, JP 89 611

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 9, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 9, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00