System and method for adjusting the rate of coolant flow through an engine based on coolant pressure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10669922
APP PUB NO 20170159546A1
SERIAL NO

14956858

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A control system according to the principles of the present disclosure includes an estimated coolant flow module and at least one of a valve control module and a pump control module. The estimated coolant flow module estimates a rate of coolant flow through a cooling system for an engine based on a pressure of coolant in the cooling system and a speed of a coolant pump that circulates coolant through the cooling system. The valve control module controls the position of a coolant valve based on the estimated coolant flow rate. The pump control module controls the coolant pump speed based on the estimated coolant flow rate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GM GLOBAL TECHNOLOGY OPERATIONS LLCP O BOX 300 DETROIT MI 48265

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gonze, Eugene V Pickney, US 195 1878
Paratore,, Jr Michael J Howell, US 109 893
Quelhas, Sergio Ann Arbor, US 21 115
Ramappan, Vijay A Novi, US 8 20

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 2, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 2, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00