Method for producing a thermoelectric material

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10662507
APP PUB NO 20170306445A1
SERIAL NO

15439004

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for producing a thermoelectric material, comprising: mixing an Sn powder and a powder containing a first dopant element to obtain a first mixed raw material, heating the first mixed raw material at a temperature allowing for mutual diffusion of Sn and the first dopant element to obtain a first aggregate, pulverizing the first aggregate to obtain a first powder, mixing an Mg powder, an Si powder, and the first powder to obtain a second mixed raw material, heating the second mixed raw material at a temperature allowing for mutual diffusion of Mg, Si, Sn and the first dopant element to obtain a second aggregate, pulverizing the second aggregate to obtain a second powder, and pressure-sintering the second powder, and wherein the first dopant element is one or more elements selected from Al, Ag, As, Bi, Cu, Sb, Zn, P, and B.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA JIDOSHA KABUSHIKI KAISHATOYOTA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Suto, Hiroyuki Susono, JP 16 72
Yamamoto, Hidenari Gotenba, JP 5 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 26, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 26, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00