Non-pneumatic tire

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10654318
APP PUB NO 20180029420A1
SERIAL NO

15597579

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In view of the above, the disclosure provides a non-pneumatic tire capable of enhancing a load supporting performance and a shock absorbing effect and improving a braking and traction performance. The present disclosure provides a non-pneumatic tire comprising a band part and a spoke part; where, a band part includes an inner band and an outer band that is separated from the inner band and surrounds an outer peripheral surface of the inner band; and where, a spoke part includes a plurality of first spokes that is arranged in a circumferential direction between the inner band and the outer band and connects the inner band and the outer band. Furthermore, according to another embodiment, a spoke part may include second spokes that connected to first spokes adjacent to each other at wherein first embodiment.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THE YOKOHAMA RUBBER CO LTDJAPAN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hwang, Soon-Wook Gwangju, KR 5 44
Kim, Kee-Woon Gwangju, KR 4 20
Kwark, Chul-Woo Gwangju, KR 3 17
Matsuda, Jun Tokyo, JP 98 868
Park, Chang-Jung Gwangju, KR 10 44
Shimizu, Michio Tokyo, JP 36 1368
Shin, Gwi-Sung Gwangju, KR 3 17

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 19, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 19, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00