Fuel cell system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10651486
APP PUB NO 20150056531A1
SERIAL NO

14385269

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A fuel cell system includes a fuel cell stack configured to generate power according to a load, a fuel tank configured to store fuel gas, a pressure regulating valve configured to regulate a pressure of the fuel gas supplied from the fuel tank to the fuel cell stack, a purge valve configured to purge the fuel gas discharged from the fuel cell stack and a controller for controlling the system. The controller includes a pulsating unit configured to cause a fuel gas pressure of the fuel cell stack to pulsate, and a pressure increasing rate setting unit configured to set a pressure increasing rate of the pulsation of the fuel gas pressure according to an operating state.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NISSAN MOTOR CO LTDYOKOHAMA-SHI KANAGAWA 221-0023

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fujii, Takahiro Hayama-machi, JP 134 1363
Ichikawa, Yasushi Hayama-machi, JP 215 4192
Ikezoe, Keigo Ayase, JP 32 93
Iwasaki, Daigo Yokosuka, JP 6 10
Maeshima, Susumu Yokohama, JP 13 29
Naka, Takashi Yokosuka, JP 6 11

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 12, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 12, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00