Battery state estimating apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10649036
APP PUB NO 20180275201A1
SERIAL NO

15915935

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A battery state estimating apparatus is provided with: an acquirer configured to obtain complex impedances of a battery at a different temperatures; a calculator configured to calculate a slope of a first straight line or a slope of a second straight line as an impedance slope, wherein the first straight line connects values of the complex impedances at a first predetermined frequency, wherein the second straight line connects a convergence point and at least one of values of the plurality of complex impedances at a second predetermined frequency; and an estimator configured to estimate a battery state associated with the battery on the basis of the impedance slope and a relation stored in a storage, if it is determined by a determinator that a temperature of the battery is in a predetermined temperature area.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA JIDOSHA KABUSHIKI KAISHATOYOTA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Mukoyama, Daikichi Tokyo, JP 11 75
Oguma, Yasumasa Tokyo-to, JP 33 60
Osaka, Tetsuya Tokyo, JP 53 444
Tsuda, Shingo Tokyo, JP 57 761
Utsumi, Kazuaki Tokyo, JP 36 912
Yokoshima, Tokihiko Tokyo, JP 21 146

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 12, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 12, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00