Multiple tool construction machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10648155
SERIAL NO

16110067

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A construction machine that includes a machine frame and an articulated boom. The articulated boom is pivotably mounted to the machine frame. The construction machine is configured to be operated in a loader mode in which a first tool is mounted to the articulated boom, and in an excavator mode in which a second tool is mounted to the articulated boom. The construction machine further includes a tool storage for storing the first tool and/or the second tool. The construction machine is configured to replace one of the first tool and second tool when mounted to the articulated boom with the other one of the first tool and second tool when stored in the tool storage.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GUANGXI LIUGONG MACHINERY CO LTD545007 THE GUANGXI ZHUANG AUTONOMOUS REGION LIUZHOU CITY LIU TAI ROAD NO 1 LIUZHOU CITY THE GUANGXI ZHUANG AUTONOMOUS REGION 545007

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Major, Gary Staffordshire, GB 15 57
Wagner, Edward Guangxi, CN 29 75
Zhao, Yunfeng Guangxi, CN 17 27

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 12, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 12, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00