Process for the production of a microfibrillated cellulose composition

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10648130
APP PUB NO 20160145805A1
SERIAL NO

14899820

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a process for the production of microfibrillated cellulose composition, wherein the microfibrillated cellulose has an average fiber length in the range from 500 to 1300 μm and a percentage of fiber length in the category ≤200 μm of at least 15%, obtained by subjecting an aqueous mixture comprising 30 to 70% by weight of cellulose containing fibers to mechanical shearing at a temperature in the range of from ≥40° C. to ≤120° C. in the presence of at least one thermostable biocide, to the microfibrillated cellulose composition obtained in this process and their use in a process for production of paper, card and board comprising draining a paper stock comprising the microfibrillated cellulose composition with sheet formation in the wire.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SOLENIS TECHNOLOGIES L P2475 PINNACLE DRIVE WILMINGTON DE 19803

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Achatz, Paul Mannheim, DE 6 16
Kloke, Philipp Mannheim, DE 8 49
Kroener, Hubertus Neustadt, DE 10 17

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 12, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 12, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00