Galvanic isolation for relay device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10644495
APP PUB NO 20190067930A1
SERIAL NO

15689246

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

One example includes a relay device that is comprised of a galvanic isolation barrier, a protection control and power extractor, and an electronic switch. The galvanic isolation barrier is coupled to an input of the relay device and receives a switch control signal and outputs another switch control signal. The protection control and power extractor is coupled to an output of the galvanic isolation barrier. The protection control and power extractor extracts power from a power supply coupled to the relay device. The protection control and power extractor is responsive to the other switch control signal and generates a protection signal in response to a determination of an operating parameter of the relay device. The protection control and power extractor further outputs an electronic switch device signal based on the generated protection signal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TEXAS INSTRUMENTS INCORPORATED12500 TI BOULEVARD DALLAS TX 75243

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Male, Barry J West Granby, US 10 130
Oljaca, Miroslav Allen, US 19 152
Singh, Ajinder Murphy, US 4 14
Stout, David W Lewisville, US 6 67

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 5, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 5, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00