Continuous processing device for forming bamboo fiber and method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10640887
APP PUB NO 20190055670A1
SERIAL NO

15770496

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A continuous processing device for forming bamboo fiber includes a machine rail, a cart guide rail, a cart, and a clamp for clamping a bamboo strip. The cart and the clamp are connected through a connecting plate. The machine rail is formed with a slot along a path of the machine rail. The machine rail includes a head linear rail section, a conical spiral rail section and a tail linear rail section arranged in sequence. The cart guide rail includes a head linear guide rail section, a conical spiral guide rail section and a tail linear guide rail section arranged in sequence. A continuous processing method for forming bamboo fiber using the continuous processing device is disclosed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JIYANG COLLEGE OF ZHEJIANG A&F UNIVERSITYNO 77 PUYANG ROAD JIYANG STREET ZHUJI CITY SHAOXING ZHEJIANG SHAOXING CITY ZHEJIANG PROVINCE 312000

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Yao, Wenbing Zhuji, CN 5 3
Zhou, Chao Zhuji, CN 126 347

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 5, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 5, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00