Method to build fast transmit-receive switching architecture

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10637160
APP PUB NO 20190089402A1
SERIAL NO

16131259

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An apparatus includes a phased array antenna panel and one or more beam former circuits. The phased array antenna panel generally comprises a plurality of antenna elements. The plurality of antenna elements are generally arranged in one or more groups. The one or more beam former circuits may be mounted on the phased array antenna panel. Each beam former circuit is generally coupled to a respective group of the antenna elements. Each beam former circuit generally comprises a plurality of transceiver channels comprising a transmit channel and a receive channel. The phased array antenna panel is generally configured to distribute a control signal to each of the beam former circuits. Each of the transceiver channels is generally configured to switch between a transmit mode and a receive mode in response to the control signal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RENESAS ELECTRONICS AMERICA INC1001 MURPHY RANCH ROAD MILPITAS CA 95035

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kanar, Tumay San Diego, US 29 78
Zihir, Samet San Diego, US 24 71

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 28, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 28, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00