Hammer assembly, keyboard instrument, and hammer

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10636394
SERIAL NO

16536424

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hammer assembly includes: a pivot member that pivots about a pivot axis; and a weight supported by the pivot member and including a plate portion. The plate portion has a first surface and a second surface opposite to the first surface. The plate portion has: a first region with a thickness defined by a length between the first surface and the second surface in a pivot-axis direction at a portion farthest from the pivot axis; and a second region with a thickness greater than that in the first region. In a case where the areas of the first region and the second region on a projected plane when the first region and the second region are viewed in the pivot-axis direction are compared with each other, the area of the first region is less than the area of the second region.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
YAMAHA CORPORATION10-1 NAKAZAWA-CHO CHUO-KU HAMAMATSU-SHI SHIZUOKA 430-8650

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Takahashi, Ken Hamamatsu, JP 280 2584

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 28, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 28, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00