Electrophotographic photosensitive member, process cartridge, and image forming apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10635009
APP PUB NO 20180356743A1
SERIAL NO

16003329

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electrophotographic photosensitive member includes a conductive substrate and a photosensitive layer having a single-layer structure. The photosensitive layer contains a charge generating material, an electron transport material, a polycarbonate resin, and a hole transport material. The electron transport material includes a compound having a halogen atom and represented by general formula (1), (2), (3), (4), or (5). The polycarbonate resin has a terminal group having a fluoro group and represented by general formula (10). The hole transport material includes a compound represented by general formula (20), (21), (22), (23), (24), (25), (26), or (27). A charge of calcium carbonate as measured by charging the calcium carbonate through friction with the photosensitive layer is at least +6.5 μC/g. The photosensitive layer has a Vickers hardness of at least 17.0 HV at 45° C.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KYOCERA DOCUMENT SOLUTIONS INCOSAKA JAPAN OSAKA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Shimizu, Tomofumi Osaka, JP 36 56

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 28, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 28, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00