Mortar gas flow insert

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10634468
SERIAL NO

16139082

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A projectile launch container configured to propel one or more projectiles associated with pyrotechnic effects including a gas flow insert comprising a first face and a second face, the gas flow insert configured to be placed within the projectile launch container, the first face configured to underlie the projectiles and the second face configured to overlie a lift charge; the gas flow insert including a plurality of gas flow openings each fluidly connected to one or more gas flow channels that extend at least substantially axially to the launch container between the first and second faces, the plurality of gas flow openings on each of the first and second faces configured to control a flow of gases from an exploding lift charge entering the second face and exiting the first face; wherein the gas flow insert is configured to remain within the projectile launch container following detonation of the lift charge.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DMD SYSTEMS LLCP/O/ BOX 635 LOS ALAMOS NM 87544

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Naud, Darren Los Alamos, US 11 46
Naud, Martin Forest Los Alamos, US 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 28, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 28, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00