Zero-discharge technique for separating sludge and salt from desulfurization wastewater

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10633271
APP PUB NO 20190077686A1
SERIAL NO

16060446

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A zero discharge process for separating sludge and salt from desulfurization wastewater includes a pretreatment process, a membrane treatment process and an evaporative crystallization process; in the pretreatment process, the desulfurization wastewater enters a raw water tank, an aeration fan introduces compressed air into the raw water tank, and the wastewater is lifted to first-stage reaction and clarification by a raw water pump; in the membrane treatment process, the incoming wastewater is first filtered by ultrafiltration, then enters a pH adjustment tank, and is pumped into a nanofiltration membrane separation system and a reverse osmosis membrane separation system; in the evaporative crystallization process, the incoming wastewater is first subjected to two-stage preheating, then enters a degasser, and finally enters an evaporative concentration system and a crystallization system.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JIANGSU JINGYUAN ENVIRONMENTAL PROTECTION CO LTDNO 109 TONGXIN ROAD CHONGCHUAN DISTRICT NANTONG CITY JIANGSU PROVINCE 226014 NANTONG CITY JIANGSU PROVINCE 226014

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ji, Xianhua Nantong, CN 1 2
Li, Kuan Nantong, CN 17 32
Li, Wulin Nantong, CN 9 9
Liu, Qinqin Nantong, CN 5 2
Lu, Xin Nantong, CN 273 2086
Wang, Chen Nantong, CN 476 3329
Xu, Hui Nantong, CN 440 2426
Yan, Feng Nantong, CN 189 2058
Zeng, Zhenguo Nantong, CN 2 3
Zhang, Xiong Nantong, CN 95 1001

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 28, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 28, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00