Array substrate and method for fabricating the same, display panel and display device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10627685
SERIAL NO

15736279

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An array substrate, a method for fabricating the same, a display panel and a display device are disclosed. The array substrate comprises leading wires, the plurality of leading wires form a plurality of grooves in a fanout area of the array substrate, the plurality of grooves are filled with a filler, and the filler filled in the grooves has an upper surface which is flush with leading wires surrounding the grooves. The filler is made from an insulating and transparent material.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BOE TECHNOLOGY GROUP CO LTD100015 NO 10 JIUXIANQIAO ROAD BEIJING CHAOYANG DISTRICT BEIJING CITY BEIJING CITY 100015
BEIJING BOE OPTOELECTRONICS TECHNOLOGY CO LTD100176 NO 8 MIDDLE XIHUAN ROAD BEIJING ECONOMIC AND TECHNOLOGICAL DEVELOPMENT ZONE DAXING DISTRICT BEIJING BEIJING CITY BEIJING CITY 100176

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Liu, Chong Beijing, CN 102 454
Pei, Xiaoguang Beijing, CN 15 10
Peng, Zhilong Beijing, CN 44 107
Wang, Wei Beijing, CN 2815 17926
Xiao, Hongxi Beijing, CN 13 30
Xiao, Zhilian Beijing, CN 11 13
Zhao, Haisheng Beijing, CN 31 46

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 21, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 21, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00