Front pillar structure

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10625787
APP PUB NO 20180273106A1
SERIAL NO

15933761

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A front pillar structure includes a first skeleton portion, a second skeleton portion extending along the first skeleton portion with a gap therebetween, and a connecting member. A cross-section of the first skeleton portion is a hollow closed cross-section and a width of the first skeleton portion in a horizontal direction orthogonal to a gaze direction of a driver seated in a driver's seat is equal to or less than a standard pupillary distance. A cross-section of the second skeleton portion is a hollow closed cross-section and a width of the second skeleton portion in the horizontal direction orthogonal to the gaze direction is equal to or less than the standard pupillary distance. The connecting member is transparent and is disposed between the first skeleton portion and the second skeleton portion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • 501 TOYOTA JIDOSHA KABUSHIKI KAISHA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ikeda, Koki Toyota, JP 65 819
Komoriya, Kazuki Toyota, JP 16 32
Ogata, Kazuyoshi Toyota, JP 10 39
Sakabe, Motoya Nissin, JP 23 152

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 21, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 21, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00