Unit for producing an assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10619297
APP PUB NO 20180171551A1
SERIAL NO

15571149

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An apparatus for producing an assembly of filamentary elements that are wound together in a helix includes a twisting device, a preforming device, and an assembling device. The twisting device is structured to twist at least first and second filamentary elements individually, such that each filamentary element is twisted separately from another filamentary element, to produce at least first and second twisted filamentary elements. The preforming device, which is arranged downstream of the twisting device, is structured to preform each of the twisted filamentary elements individually into separate preformed helixes, to produce at least first and second preformed helixes. The assembling device, which is arranged downstream of the preforming device, is structured to assemble the preformed helixes into an assembly.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
COMPAGNIE GENERALE DES ETABLISSEMENTS MICHELIN23 PLACE DES CARMES-DECHAUX 63000 CLERMONT-FERRAND 63000

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aubarede, Francis Clermont-Ferrand, FR 12 57
Barguet, Henri Clermont-Ferrand, FR 30 293
Calvet, Marc Clermont-Ferrand, FR 6 33

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 14, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 14, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00