Production control in a blow room

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10619270
APP PUB NO 20180355519A1
SERIAL NO

16003155

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system and corresponding method are provided for controlling production in a blow room, the blow room including a controller, a supplying machine having a supplying part, and a machine to be supplied that has a filling level measurement. The supplying machine and the machine to be supplied are connected to the controller. A production area is defined for the supplying machine and includes a minimum production and a maximum production. Production of the supplying part of the supplying machine is determined based on a filling level of the filling level measurement. When production of the production area drops below the minimum production, the supplying part of the supplying machine is shut down, the shutdown taking place independently of the filling level of the machine to be supplied.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MASCHINENFABRIK RIETER AGKLOSTERSTRASSE 20 WINTERTHUR 8406

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gschliesser, Gerhard Winterthur, CH 7 10
Lüthard, Reto Winterthur, CH 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 14, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 14, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00