Vacuum air lift systems including a fluidized bed reactor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10618824
APP PUB NO 20190077679A1
SERIAL NO

16182092

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Embodiments include a vacuum airlift system for treating an aqueous effluent including an upflow liquid column, where the upflow liquid column is configured to retain a fluid, a fluid inlet, the fluid inlet being fluidly coupled with the upflow liquid column, where the fluid inlet is positioned at about the bottom of the upflow liquid column, a downflow liquid column, a fluid outlet, the fluid outlet being fluidly coupled with the downflow liquid column, wherein the fluid outlet is positioned at about the bottom of the downflow liquid column, and a plurality of moving bed biofilm reactors, the plurality of moving bed biofilm reactors being positioned in the upflow liquid column or the downflow liquid column.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SEAREN LLCCINCINNATI OH

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Andrews, Thomas Wood Cincinnati, US 5 2
Briquet, Emmanuel Pierre Pascal Cincinnati, US 5 2
Brooks,, Jr John Rodgers Cincinnati, US 4 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 14, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 14, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00