Electronic device with conductive structure directly abutting metal frame to ground bracket

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10615525
SERIAL NO

16585533

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electronic device is provided. The electronic device includes a substrate, a connector, a ground bracket and a conductive structure. The substrate includes a ground layer. The connector is disposed on the substrate, wherein the connector includes a metal frame. The ground bracket is affixed on the substrate and coupled to the ground layer, wherein at least a portion of the connector is located in the ground bracket. The conductive structure is adapted to abut the metal frame and to abut the ground bracket, wherein when the conductive structure connects the metal frame to the ground bracket, the conductive structure electrically connects the ground bracket to the metal frame.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
WISTRON NEWEB CORPHSINCHU

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kuo, San-Yi Hsinchu, TW 30 136
Lin, Yi-Chieh Hsinchu, TW 90 213
Lu, Cheng-Hsiung Hsinchu, TW 10 19
Lu, Man-Ning Hsinchu, TW 5 1
Wu, Huei-Chi Hsinchu, TW 3 2
Yu, Yu-Cheng Hsinchu, TW 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 7, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 7, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00