Rail vehicle, method for driving a rail vehicle and method for producing a rail vehicle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10611385
SERIAL NO

15554068

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A rail vehicle (1), a method of producing and method of driving the rail vehicle (1) which comprises at least one car body (2). The car body (2) comprises two car body ends (3, 4) the end region of which is supported on a respective wheel unit (5, 6). At least one wheel unit (5, 6) is designed to be driven. The rail vehicle comprises a drive arrangement comprising a transformer unit (7), a traction motor unit (9) and a power converter unit (8). The primary transformer unit (7) and primary power converter unit (8) are arranged adjacent the first wheel unit (5). The primary transformer unit (7) and the primary power converter unit (8) are connected to the second wheel unit (6) such that a traction motor unit (9), of the second wheel unit (6), can be driven by the primary transformer unit and the primary power converter unit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
STADLER RAIL AGERNST-STADLER-STRASSE 1 BUSSNANG 9565

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Forrer, Daniel Bronschhofen, CH 2 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 7, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 7, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00