Valve control device and valve control method

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10605185
APP PUB NO 20190145328A1
SERIAL NO

16182860

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A valve control device controls an opening degree of a valve provided in an intake passage, an exhaust passage, or a passage connected one of these and includes an observed value acquisition unit, an inlet temperature acquisition unit, a target calculation unit, an equilibrium opening degree calculation unit, an observer, a correction opening degree calculation unit, an instruction opening degree calculation unit, and an output unit. The target calculation unit calculates an equilibrium state value and a target property value. The correction opening degree calculation unit calculates a correction opening degree by multiplying a gain matrix by a deviation vector including, a deviation between the equilibrium state value and the estimated state value and an integrated value of a deviation between the target property value and the estimated property value.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HINO MOTORS LTDHINO-SHI TOKYO 191-8660

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nakano, Hitoshi Hino, JP 47 721
Takayama, Hidemasa Hino, JP 3 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 30, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 30, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00