Method for producing solid fuel tablets, solid fuel tablets, gas generator, and module having a gas generator

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10604105
APP PUB NO 20130269562A1
SERIAL NO

13823165

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An inflator (30) comprises at least one combustion chamber (34), filled with a plurality of solid propellant pellets (10), each of the solid propellant pellets (10) including a surface having a breaking point (19) which is delimited at least by two converging surfaces (28) produced by pressing. A method of manufacturing solid propellant pellets (10), includes the steps of providing a solid propellant (12), pressing the solid propellant (12) into a pellet blank (16), the pellet blank (16) having at least one predetermined breaking point (18) which divides the pellet blank (16) into at least two subareas (20), and breaking the pellet blank (16) along the at least one predetermined breaking point (18), wherein each of the at least two subareas (20) forms a solid propellant pellet (10).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TRW AIRBAG SYSTEMS GMBHWERNHER-VON-BRAUN-STR 1 ASCHAU AM INN D-84544

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bernau, Klaus Soyen, DE 3 14
Bichlmaier, Christian Schonberg, DE 4 1
Reichgruber, Sebastian Engelsberg, DE 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 30, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 30, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00