Vehicle power supply control device

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10604091
APP PUB NO 20180222412A1
SERIAL NO

15889446

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A vehicle power supply control device includes a main line unit of one system, branch line units, a vehicle power supply master, and an area power supply master. The main line unit of the one system is provided to a vehicle. Each of the branch line units branches from the main line unit of the one system. The vehicle power supply master includes a main battery that charges and discharges electric power. The area power supply master is connected to the main line unit of the one system through the branch line unit and is connected to a load unit that consumes electric power, and includes an area battery that charges and discharges electric power. The vehicle power supply master supplies electric power of the main battery to the area power supply master through the main line unit of the one system.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
YAZAKI CORPORATION4-28 MITA 1-CHOME MINATO-KU TOKYO 108-8333

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aoki, Yoshihito Shizuoka, JP 26 392

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 30, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 30, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00