Process of making compreg multi-colored laminated wood and utility, ornamental, decorative products thereof

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10603812
APP PUB NO 20190105799A1
SERIAL NO

15969674

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention is a process including the steps of manufacturing of compreg laminated wood and transforming the wood thus obtained to ornamental and utility products, including steps of quality checking, veneer selection, Impregnation of veneer with solution of dye and thermosetting resin, drying in kiln, glue spreading followed by bunching, followed by cooling resulting in creation of slab, followed by trimming & cutting of slabs into strips of small sizes, shaping drawing on the sheet as per the profile required, shaping and profiling by CNC Router Machines, grinding and shaping by expert craftsman to bring out the color patterns, end rounding for smooth edges, grinding using various grits of emery wheels for surface finish, polishing/buffing for mirror like surface finish.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KNITPRO INTERNATIONALPLOT NO 28 29 NOIDA SPECIAL ECONOMY ZONE BLOCK A PHASE-2 NOIDA UTTAR PRADESH 201305

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Rastogi, A K Noida, IN 1 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 30, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 30, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00