Sinter-brazed component

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10603732
APP PUB NO 20170252844A1
SERIAL NO

15506528

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

It is an object of the present invention to effectively suppress the overflow of brazing material from each joint of a sinter-brazed component, such as a planetary carrier, obtained by brazing a plurality of members together. According to the present invention, there is provided a sinter-brazed component obtained by mating and joining a first member having a first bonding surface and a second member having a second bonding surface to each other. Brazing material is provided between the first bonding surface and the second bonding surface. The first bonding surface has a first recess, the first recess having an inner peripheral wall and a bottom surface. The inner peripheral wall extends along and on an inner side of a profile line of the first bonding surface.

First Claim

See full text

Other Claims data not available

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUMITOMO ELECTRIC SINTERED ALLOY LTD2901 NARIWA NARIWA-CHO TAKAHASI-SHI OKAYAMA 716-0192

International Classification(s)

loading....
  • 2015 Application Filing Year
  • B23K Class
  • 2354 Applications Filed
  • 1765 Patents Issued To-Date
  • 74.98 % Issued To-Date
Click to zoom InYear of Issuance% of Matters IssuedCumulative IssuancesYearly Issuances20152016201720182019202020212022202320240255075100

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hirono, Shinichi Itami, JP 8 21
Okuno, Reiko Itami, JP 3 11

Cited Art Landscape

Load Citation

Patent Citation Ranking

  • 2 Citation Count
  • B23K Class
  • 61.89 % this patent is cited more than
  • 5 Age
Citation count rangeNumber of patents cited in rangeNumber of patents cited in various citation count ranges804481103101 - 1011 - 2021 - 3031 - 40050100150200250300350400450500550600650700750800850

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 30, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 30, 2031