Manufacturing method for TFT array substrate and TFT array substrate

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10600825
APP PUB NO 20190355767A1
SERIAL NO

16098441

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention provides a manufacturing method for TFT array substrate and TFT array substrate. The manufacturing method forms a first buffer layer on the substrate; the first buffer layer is disposed with a plurality of arc protrusions or a plurality of arc recesses; then an a-Si layer is formed on the second buffer layer which is formed on the first buffer layer; in the process of forming a polysilicon layer by performing ELA on the a-Si layer, the arc protrusions or the arc recesses can change the optical path of the laser to form an energy gradient in the a-Si layer, so as to increase the grain size in the formed polysilicon layer, reduce the number of grain boundaries, improve the carrier mobility of the TFT device, and improve the electrical properties of the TFT device.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SHENZHEN CHINA STAR OPTOELECTRONICS TECHNOLOGY CO LTDNO 9-2 TANGMING ROAD GUANGMING DISTRICT SHENZHEN CITY GUANGDONG 518132

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Wang, Song Shenzhen, CN 304 4325
Zhang, Ruijun Shenzhen, CN 6 8

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 24, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 24, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00