Power converter

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10600716
APP PUB NO 20180337107A1
SERIAL NO

15970066

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power converter includes: two switching elements; a positive electrode conductive plate: a negative electrode conductive plate; a mid-point conductive plate; a first heat sink; and a second heat sink. The positive electrode conductive plate is connected to a high-potential terminal of a series connection of the two switching elements, and the negative electrode conductive plate is connected to a low-potential terminal of the series connection. The mid-point conductive plate is connected to a middle point of the series connection. The first heat sink faces the positive electrode conductive plate and the negative electrode conductive plate with a first isolating layer interposed therebetween, and is connected to a ground terminal. The second heat sink faces the mid-point conductive plate with a second isolating layer interposed therebetween, and is isolated from the ground terminal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA JIDOSHA KABUSHIKI KAISHA1 TOYOTA-CHO TOYOTA-SHI AICHI-KEN 471-8571

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kida, Yoshihiro Nishio, JP 5 4
Torii, Kaoru Toyota, JP 6 15

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 24, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 24, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00