Article transport facility

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10600666
APP PUB NO 20180122671A1
SERIAL NO

15792925

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An article transport facility includes a transport device which has a connecting portion connected to the storage device, and which is configured to transport an article. The connecting portion is located on the first side with respect to the first path whereas a subject path is located on the second side with respect to the first path. The transporting path of an article by the transport device is so located to cross the first path in plan view and to extend at least from the connecting portion and to the second side with respect to the first path. A first transfer portion to or from which an article is transferred by a transport vehicle traveling along the subject path is set in a portion of the transporting path that is located on the second side with respect to the first path.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DAIFUKU CO LTD3-2-11 YUCOIN ISLAND XIDIANCHUAN DISTRICT OSAKA CITY JAPAN OSAKA-SHI OSAKA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Horii, Takahiro Hinocho, JP 7 24
Niiyama, Takashi Hinocho, JP 10 237

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 24, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 24, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00