Systems and methods for controlling traffic lights

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10600320
APP PUB NO 20200035096A1
SERIAL NO

16220250

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for controlling traffic lights is provided. The method may include obtaining historical track data of a plurality of vehicles. The method may include obtaining a congestion period. The method may include determining a discharge speed during the congestion period based on a portion of the historical track data corresponding to the congestion period. The method may further include determining an offset value based on a length of the road, the discharge speed, a cycle length of a first traffic light at the downstream intersection, a cycle length of a second traffic light at the upstream intersection, and a time length of a green light of the second traffic light being lit, and determining a signal timing of the second traffic light based on the offset value.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BEIJING DIDI INFINITY TECHNOLOGY AND DEVELOPMENT CO LTDBEIJING

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Liu, Xianghong Tianjin, CN 17 117
Sun, Weili Beijing, CN 9 8
Zheng, Jianfeng Beijing, CN 24 45
Zhu, Jinqing Beijing, CN 6 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 24, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 24, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00