Developer supply container with discharge of developer using gas

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10599065
SERIAL NO

16442587

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A developer supply container includes a rotating container for conveying a developer and an intermittent regulator for intermittently supplying gas into the rotating container and regulating an internal pressure of the rotating container. A fixed amount of gas is intermittently supplied by the intermittent regulator to the gas mixing space and is discharged from the powder discharging port after the fixed amount of gas is mixed with the developer. Since the intermittent regulator can periodically supply the fixed amount of gas to the gas mixing space, the fixed amount of gas ensures a stable gas pressure inside the developer supply container. The developer supply container can continuously and stably replenish the developer into the image forming device under any storage or operating environment. The air pressure of the developer supply container is maintained at a stable level and a high precision replenishment amount of the developer is achieved.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JIANGXI KILIDER TECHNOLOGY CO LTDHUANGYUAN AREA ECONOMIC AND TECHNOLOGICAL DEVELOPMENT ZONE SHANGRAO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
He, Jiabing Shangrao, CN 7 4
Li, Zhongxi Shangrao, CN 7 4
Zhu, Jinjun Shangrao, CN 8 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 24, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 24, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00