Universal grid analyzer

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10598704
APP PUB NO 20170016940A1
SERIAL NO

14802307

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Embodiments of the present invention may provide a device for monitoring electric power at the distribution level. The device may include an analog-to-digital converter (ADC) to convert an input signal into digital samples at time intervals, a receiver to generate a pulse-per-second (PPS) signal, an oscillator to generate an oscillator signal, and a data processor coupled to the ADC, the receiver, and the oscillator. The data processor may include a counter to measure an oscillator frequency of the oscillator signal at each pulse of the PPS signal, an adjuster to adjust a timer period register value, and a timer to adjust the time intervals based on the adjusted timer period register value. Based on the digital samples, the data processor may generate a plurality of metrics, which may include one or more measurements of frequency, magnitude, phase, harmonic level, signal-to-noise ratio, sag, and swell of the input signal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UNIVERSITY OF TENNESSEE RESEARCH FOUNDATION505 SUMMER PLACE UTT #961A KNOXVILLE TN 37902

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Liu, Yilu Knoxville, US 27 266
Yao, Wenxuan Knoxville, US 11 49
Zhan, Lingwei King of Prussia, US 6 13

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 24, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 24, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00