Powertrain with engine start function using resettable engine speed profile

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10597020
APP PUB NO 20190176799A1
SERIAL NO

15836163

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hybrid electric powertrain includes an electric machine delivering torque to an engine in an engine start event having initial cranking and transition phases. In response to a request for an engine start event, a controller commands delivery of the motor torque to the crankshaft. In the initial cranking phase the controller regulates crankshaft acceleration from zero speed up to a target cranking speed in a closed-loop manner via a predetermined fixed profile. In the transition phase, the crankshaft accelerates from the target cranking speed to a target idle speed using a feed-forward torque value blended, using a calibration table, from a predetermined engine drag torque to a reported engine torque. In the transition phase the controller periodically adjusts a speed trajectory of the crankshaft, with the magnitude and frequency of adjustment based on combustion of the engine and calibration of the feed-forward torque.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GM GLOBAL TECHNOLOGY OPERATIONS LLCP O BOX 300 DETROIT MI 48265

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aldrich, Jeffrey R Davison Township, US 10 27
Burt, Anthony Ferndale, US 1 1
Christman, Anthony L Madison Heights, US 1 1
Lombardo, Paul S Ferndale, US 15 133
Potts, Michael D South Lyon, US 2 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 24, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 24, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00