Material separators

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10596599
APP PUB NO 20190337017A1
SERIAL NO

16515156

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The disclosure features material separators for screening excavated material (e.g., rocks from soil.) In some implementations the materials separators include (a) a supporting frame; (b) a screening surface mounted at an incline on the supporting frame, the screening surface comprising a plurality of fixed bars that are attached to the frame in a manner to resist upward movement, and a plurality of shift bars that are attached to the frame at their upper and lower ends, in a manner to allow upward movement; and (c) a shift bar actuator, positioned between the upper and lower ends of the shift bars, the shift bar actuator being configured to impart a two-stage movement to the shift bars, whereby during a first stage the upper ends are first displaced vertically, and during a second stage the lower ends pivot upward about the upper ends.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SNOW MICHAEL DAVIDBEND OR

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Snow, Michael David Bend, US 4 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 24, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 24, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00