Target assembly and isotope production system having a grid section

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10595392
SERIAL NO

15185923

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Target assembly includes a target body having a production chamber and a beam passage. The target body includes first and second grid sections that are disposed in the beam passage. Each of the first and second grid sections has front and back sides. The back side of the first grid section and the front side of the second grid section abut each other with an interface therebetween. The back side of the second grid section faces the production chamber. The target assembly also includes a foil positioned between the first and second grid sections. Each of the first and second grid sections has interior walls that define grid channels through the first and second grid sections. The particle beam is configured to pass through the grid channels toward the production chamber. The interior walls of the first and second grid sections engage opposite sides of the foil.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GENERAL ELECTRIC COMPANY1 NEUMANN WAY EVENDALE OH 45215

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Eriksson, Tomas Uppsala, SE 41 289
Larsson, Johan Uppsala, SE 68 666
Pärnaste, Martin Uppsala, SE 6 20

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 17, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 17, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00