Single shaft dual expansion internal combustion engine

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10590841
SERIAL NO

14751673

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A single-shaft dual expansion internal combustion engine includes an engine block, a cylinder head and a crankshaft. First and second power pistons are moveable in first and second power cylinders and are connected to first and second crankpins of the crankshaft. An expander piston is moveable in an expander cylinder and is connected via a multi-link connecting rod assembly to a third crankpin of the crankshaft. A first balance shaft is arranged in a first longitudinal opening in the engine block, and a second balance shaft is arranged in a second longitudinal opening in the engine block. The first and second balance shafts have first and second counterweight portions, respectively, and the crankshaft has a third counterweight portion causing an imbalance in the crankshaft.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GM GLOBAL TECHNOLOGY OPERATIONS LLCP O BOX 300 MAIL CODE 482-C24-A65 DETROIT MI 48265

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Du, Hung-Yih Isaac Rochester Hills, US 3 2
Durrett, Russell P Bloomfield Hills, US 36 352
Zhou, Jun Troy, US 413 4719

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 17, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 17, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00