Methods and systems for enhancing cooling pond performance and salt production in a solution mining operation

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10589185
SERIAL NO

15537104

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A cooling pond system and related methods of improving cooling performance in a cooling pond system using one or more submerged dams to increase cooling performance within the cooling pond system, and increase salt precipitation or recovery. The inclusion of one or more submerged dams within an existing cooling pond system can reduce an outflow temperature by 1-5° F. as compared to the same cooling pond system without any submerged dams. In addition or alternatively, pond depth can be controlled to enhance flow mixing and convection cooling. As the temperature is reduced throughout the cooling pond system, more potassium containing salts are precipitated from the brine solution resulting in increased production or recovery within the same cooling footprint.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THE MOSAIC COMPANY3033 CAMPUS DRIVE SUITE E490 PLYMOUTH MN 55447

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Batta, Rubeena Regina, CA 3 2
Heinbigner, Carey Moose Jaw, CA 13 54
Jacobson, Kathlene Laurie Saskatoon, CA 12 29
Schultz, Murray Moose Jaw, CA 6 11
Shaver, Grant Regina, CA 3 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 17, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 17, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00