Tangential force internal combustion engine

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10584587
APP PUB NO 20190211678A1
SERIAL NO

15865707

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An internal combustion engine utilizes the four-cycle process. Gas working chambers are formed using portions of a toroid, two opposing pistons, and seals at the inner gap. A cycle occur over 360 degrees of the toroid with gas ports appropriately placed. One Power Vane (PV) and one Reaction Vane (RV) connect to a central shaft with one piston assembly attached to each end of each vane. The PV produces driving torque on a central shaft through an Overrunning Clutch System (OCS). At specific angles and for controlled durations the PV and RV are slowed, stopped, held to the housing, and then accelerated and coupled to the shaft. Vane movement is controlled by gears, cam ramps, and pin mechanisms operated via multiple, independent but time-coordinated systems. The power vane has no controlled acceleration as combustion forces couple this vane to the shaft via the OCS.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MCLEAN HUGHLEBANON IN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
McLean, Hugh Lebanon, US 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 10, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 10, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00