Drive station arrangements

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10583846
APP PUB NO 20180186385A1
SERIAL NO

15399567

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention generally relates to a rail transport system having no internal drive, and in particular to an improved rail transport system for conveying bulk materials. The rail transport system includes horizontal and vertical drive stations that include a drive tire that rotates on a plane parallel to the track. In this arrangement, force is applied on a different plane than earlier systems, and the reaction force is separated out of the tensioning device. The improvements of the drive stations provide for a reduction of steel used in the system, improved manufacturability and, therefore, reduction in system component costs as compared to previous drive stations. Moreover, the drive stations allow for improved maintainability and access to the drive tires.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RAIL-VEYOR TECHNOLOGIES GLOBAL INCLIVELY ONTARIO P3Y 1L7

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fantin, Patrick Walter Joseph Hanmer, CA 4 10
Fisk, James Everrett Antioch, US 4 10
Hellberg, Esko Johannes Lively, CA 4 10
McCall, William John Garson, CA 5 10
Niemeyer, David Wilhelm Val Caron, CA 4 10
Reay, Curtis Ron Hanmer, CA 4 10
Zanetti, Eric Benjamin Alexander Sudbury, CA 4 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 10, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 10, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00