Tokamak with poloidal field coil arrangement for double null merging ignition, method therefor and nuclear fusion reactor with the same

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10580535
APP PUB NO 20190392956A1
SERIAL NO

16481903

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A tokamak comprising a toroidal containment vessel and a plasma initiation system. The toroidal containment vessel is configured to contain a plasma. The plasma initiation system comprises upper and lower poloidal field, PF, coil sets. Each PF coil set comprises at least one inner PF coil located outside of the containment vessel, an outer PF coil located inside the containment vessel, and shielding located between the outer PF coil and a location of the plasma during operation of the tokamak and configured to protect the outer PF coil from heat emitted by the plasma. The inner and outer PF coils are configured so as to form a PF null within the containment vessel between the inner and outer PF coils, such that the upper and lower PF coil pairs are operable to initiate a plasma in the containment vessel via double null merging.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOKAMAK ENERGY LTD173 BROOK DRIVE MILTON ABINGDON OXFORDSHIRE OX14 4SD UNITED KINGDOM

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gryaznevich, Mikhail Abingdon, GB 7 29
McNamara, Steven Anthony Milton London, GB 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 3, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 3, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00