Apparatus and method for progressive reduction of flue gas

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10578304
APP PUB NO 20190011126A1
SERIAL NO

15921629

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An apparatus and a method for achieving progressive reduction of flue gas is disclosed. Accordingly, an aspect of the present invention is to provide an apparatus comprising of an orifice chamber having an inlet pipe for receiving the flue gas, a flow region defined downstream of an exit of the inlet pipe and having at least a first section and a second section, and an outlet pipe to disperse a pressure reduced flue gas. The first section defined downstream of the inlet pipe has a flow developer means and at least one auxiliary orifice plate. The second section defined downstream of the first section has a plurality of orifice plates spaced apart along a flow length of the second section.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INDIAN OIL CORPORATION LIMITED400051 MUMBAI

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bhattacharyya, Debasis Faridabad, IN 62 310
Gadari, Saidulu Faridabad, IN 2 1
Khan, Shoeb Hussain Faridabad, IN 7 9
Kumaran, Satheesh Vetterkunnel Faridabad, IN 12 28
Ramakumar, Sankara Sri Venkata Faridabad, IN 142 104
Yadav, Manoj Kumar Faridabad, IN 10 70

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 3, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 3, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00